Tube running
boards cater a GMC Motor lorry owner with an intermediate operation between the ground and the floor of the Motor lorry.3. Thread the mounting bolts through the holes in the tube running board's flat mounting bracket and into the factory-drilled holes in the GMC's frame rail. Thread the retaining nuts onto the end of the bolts and tighten each nut and bolt together with the socket set. Whether you annex basic auto-repair abilities, you can install tube running boards in less than an time.
Instructions
1. Abode the jack stands under the GMC's handle side, one just in front of the back tire, the other just behind the front tire.
2. Remove the left tube running board from the packaging and place it on the jack stands, with the flat mounting bracket facing the outboard side of the driver's side frame rail.
This makes getting into and gone of the Motor lorry yet easier. The tube running boards further add visual request to the Motor lorry's exterior, very as reward to the Motor lorry when the lifetime comes to sell it. You can obtain tube running boards wrapped up your resident GMC dealer, your limited auto-parts store or a four-wheel handle shop.
4. Move the two jack stands to the passenger side and repeat Steps 2 and 3 to install the right tube running board on your GMC.
5. Move the jack stands out from under the truck before driving.